Application Specification and Site Requirements of Corrosion Test Chamber

April 19,2022

Only by strictly observing the service specification of the corrosion test chamber can the corrosion test chamber have a long service life and be in the best state. The following describes the service specification of the lower corrosion test chamber.

 

corrosion test chamber

 

Specification for use of corrosion test chamber

 

Startup and shutdown maintenance

 

  • When the corrosion test chamber is not used for a long time, it is necessary to drain the water in the saturator;

 

  • When the corrosion test chamber is used again, it is necessary to comprehensively check whether each electrical system of the tester is normal before it can be started.

 

Post maintenance test

 

  • To avoid the accumulation of salt solution crystals affecting the calculation of settlement, the solution in the measuring cup shall be poured out and cleaned in time after the test;

 

  • After the test, the oil and water shall be drained;

 

  • After each test, clean the corrosion test chamber, saltwater tank, pressure bucket, and dense water tank with clean water.

 

Other

 

  • Keeping the test brine and the water used in the saturator clean can improve the service life of the nozzle and saturator;

 

  • the salt solution after spray should not be used repeatedly.

 

  • When the corrosion test chamber is in normal use, the water stored in the saturator shall be replaced regularly;

 

  • It is strictly prohibited to clean the control panel with water and various liquids;

 

  • Direct sunlight and other heat sources are strictly prohibited;

 

  • The corrosion test chamber shall be placed horizontally and kept stable.

 

Site requirements for placing corrosion test chamber in the laboratory

 

After buying the corrosion test chamber, the commissioning personnel will explain the factory requirements for the corrosion test chamber, and correctly place the environment and conditions, which can extend the service life of the test chamber.

 

  1. Installation site

 

There is no strong vibration around the equipment.

 

There is no strong electromagnetic field around the equipment.

 

No direct sunlight or direct radiation from other heat sources.

 

Appropriate use and maintenance space shall be reserved around the equipment.

 

Because the cover and box body is sealed by water, the salt mist can be prevented from overflowing. The corrosion test chamber shall be placed stably and kept horizontal.

 

A separate compartment is not easy to be placed together with any other equipment to prevent corrosion of other equipment and instruments.

 

Do not shift frequently.

 

  1. Power supply conditions

 

Power requirements: AC220V ± 10% / AC380V ± 10% 50 ± 0.5Hz three-phase five wire system

 

Pre-installed power: total power of salt spray corrosion test chamber + 2KW

 

  1. Environmental conditions

 

Ambient temperature: 5 ℃ + 30 ℃ (average temperature within 24 hours ≤ 30 ℃)

 

Ambient humidity: ≤ 85% RH

 

  1. Water supply conditions

 

Purified water, distilled water, and deionized water are used. Resistivity ≥ 500 Ω m

 

  1. Other precautions

 

Opening the door of the corrosion test chamber during the test will cause temperature and humidity fluctuations in the chamber; During the test, if the door is opened many times or for a long time, or the test sample emits wet steam, the heat exchanger of the refrigeration system may freeze and fail to work normally.

 

If you want to know the corrosion test chamber price, we hope to be your choice and we also supply dust test chamber, any interests, plz feel free to contact us.

SHARE US: